Projects

Built on Trust

Cochran’s reputation for quality customer service has been built on a strong foundation of performance. We are known for honoring our commitments and as a result, 95% of our clients come back for new projects.

St. Louis Avenue Improvements

Chronic flooding along the approximately 1.05-mile St. Louis Avenue corridor in Valley Park resulted from extremely flat topography, undersized storm sewer infrastructure, and limited positive surface drainage. In response, the City advanced a three-phase program of drainage and roadway improvements. Cochran supported the effort by helping secure federal Surface Transportation Program (STP) funding for all three phases and providing surveying, hydraulic modeling, engineering design, bidding document preparation, and construction engineering and inspection services.

Project Details

Market

Transportation

Location

Valley Park, Missouri

Size

Phase 1: 1,925 LF
Phase 2: 2,200 LF
Phase 3: 1,405 LF

Services

Hydrologic and Hydraulic Analysis
Survey
Hydraulic Modeling
Engineering Design
Preparation of Bid Documents
Construction Engineering
Inspection

Cochran performed detailed hydrologic and hydraulic analyses to evaluate existing storm sewer capacity, surface flow patterns, and downstream conveyance constraints. Because of the nearly flat roadway profile, the design required careful grading and inlet placement to improve surface drainage without full-depth reconstruction of the entire corridor. Cochran developed an alternative approach using variable-slope curb and gutter, linear grading, and a redesigned storm sewer inlet network to improve runoff collection and conveyance.

The revised drainage design reduced localized ponding and improved stormwater system capacity while reducing construction costs by approximately $50,000. The savings allowed the City to incorporate decorative street lighting into the project without increasing the overall budget. The improvements also included storm sewer installation and upsizing, new curb inlets, curb and gutter replacement, pavement reconstruction and overlay, ADA-compliant sidewalks and curb ramps, and coordination with the Metropolitan St. Louis Sewer District for downstream system compatibility.

Phase 1 included approximately 1,925 linear feet of improvements to St. Louis Avenue and was completed in 2021. Phase 2 included approximately 2,200 linear feet of improvements and was completed in 2022. Phase 3 includes approximately 1,405 linear feet of improvements along St. Louis Avenue and Beckett Memorial, along with improvements to Marshall Road extending to the railroad tracks. Phase 3 includes asphalt overlay, new curb and gutter, stormwater improvements, accessible sidewalks and curb ramps, and street lighting.

Together, the three phases address long-standing drainage concerns while improving the roadway and pedestrian environment along St. Louis Avenue. The phased approach allowed the City to address the corridor’s drainage deficiencies while coordinating roadway, sidewalk, lighting, and stormwater improvements within available funding.

Connect with Cochran

Connect with us to bring the right expertise to your next project.