Cochran has been involved with the design, management, and construction administration of on-system, off-system, and private bridge projects throughout the state of Missouri. Our design experience involves structures utilizing pre-cast, pre-stressed concrete members, structural steel plate girders, post-tensioned concrete members, reinforced concrete box culverts and large diameter corrugated metal pipes. Additional experience includes bridge rehabilitation work and working with county bridge crews.
Mr. Tary Todd, P.E., Director of Bridge Design, is responsible for the technical work and overall project management of our bridge projects. Mr. Todd has been involved with the design, management, and construction of off-system and non-off-system bridge projects throughout the state of Missouri. His design experience involves structures utilizing pre-cast, pre-stressed concrete members, structural steel plate girders, post-tensioned concrete members, reinforced concrete box culverts and large diameter corrugated metal pipes. He also has considerable experience in bridge rehabilitation work and working with county bridge crews. Mr. Todd has also performed the production and review of shop drawings for several clients.
Off-System |
On-System |
County/Private |
|
Audrain |
2 |
|
5 |
Boone |
|
3 |
|
Chariton |
1 |
|
|
Cole |
2 |
|
5 |
Dade |
2 |
|
|
Franklin |
9 |
|
4 |
Iron |
|
|
1 |
Jackson |
|
2 |
|
Jefferson |
5 |
|
5 |
Johnson |
3 |
|
3 |
Knox |
2 |
|
|
Lincoln |
|
|
1 |
Linn |
6 |
|
24 |
Madison |
|
|
1 |
Montgomery |
|
|
1 |
Osage |
|
|
1 |
Ozark |
2 |
|
|
Pettis |
1 |
|
|
Polk |
1 |
|
|
Randolph |
|
|
7 |
Ray |
1 |
|
|
Scotland |
1 |
|
|
St. Charles |
|
|
2 |
St. Clair |
1 |
|
|
St. Francois |
1 |
|
1 |
St. Louis |
2 |
|
2 |
Sullivan |
2 |
|
2 |
Washington |
2 |
|
|
Totals= |
46 |
5 |
65 |