City of Union

Cochran studied and designed a 750 gallon/minute deep well for the City of Union.  Cochran performed all aspects of design, including:  conceptual layouts, survey, grading, DNR approvals, site design, hydraulic evaluation, pump selection, architectural, structural, electrical and controls, specifications, bid documents, inspection and testing.  Cochran met with the Missouri Department of Natural Resources prior to designing the deep well to discuss possible issues and formulate a plan for the project.  The design of the deep well was completed in 2013.  Construction of Deep Well No. 7 was complete in 2014.