Client – East Central Community College

Cochran has served the East Central College on several projects over the years. Our services for the College include civil, landscape, utility, stormwater, water, sanitary and transportation design, grants, survey, geotechnical, environmental, testing, inspection and construction administration.

Cochran’s history is deeply rooted with East Central College, local knowledge and united with the benefit of 17 great graduates and several projects. Cochran has had the opportunity to serve the College on several project listed below. Cochran has the local know how to design for the best value, while planning for future change.

Business and Industrial Learning Facility – Located adjacent to the main ECC campus in Union, this 21,000 square foot facility was originally designed by Cochran for a private owner as an event center in 2010, and purchased for repurpose by ECC in 2016.   This project involves a full facility assessment of the building and property prior to the purchase of the building.  Upon purchase the project involved the reconfiguring of the space as a learning center for HVAC, welding, industrial engineering and precision machining labs with an addition of 4,000 to the building.  The project was assisted with funding through the acquisition of an EDA grant of 1.2M.  Cochran provided architectural, civil, MEP, structural, environmental and survey services.

Administration Building Renovation/Buescher Hall – Design of site improvements for the Buescher Hall Renovations in collaboration with ECC and the Lawrence Group Team. The improvements include renovation and expansion of the front and rear of the building, sidewalk and patio renovations, and a design and construction of a new potable water main and fire protection extension to Highway 50, new roadways, 75 space parking lot addition, a storm water detention system including a water feature system and construction administration.

Nursing, Health and Science Building – Cochran performed construction materials and inspection testing on the new Nursing, Health, and Science Building. The scope of work included compaction testing during general grading, high plastic clay observation and removal recommendation, rock excavation observations, foundation excavation observations, reinforcing steel observations, structural steel observations, masonry observations and testing, backfill compaction testing and observation, fresh concrete testing, asphalt compaction testing, vapor emission, and concrete moisture tests.

College Drive Extension to Audrey Lane – Cochran provided full design services for the Audrey Lane road improvements from College Drive to Audrey Lane. The scope included 2,4000 lf of new roadway, associated grading, curb, gutter, and storm sewer. Cochran provided civil design, survey, construction testing/inspection and construction administration services.