Old Manchester Phase 2 Improvements

City of Wildwood

Cochran performed the surveying, engineering design, permitting through MSD, and bidding documents, for this federally funded STP road reconstruction project on Old Manchester in the City of Wildwood.  The project included removal of improvements, earthwork, full depth pavement replacement, rock excavation, 1,271 tons asphalt pavement, 2,955 sf concrete pavement, 2,372 sf stamped and red tinted concrete pavement, 31,069 sf concrete sidewalk, ADA ramps, 1,640 sf concrete approach, 4,377 lf concrete vertical curb, 896 lf storm sewer, utility relocations, 7 individual bioretention basins, hydrodynamic separator, landscaping, 80 street trees, cast iron tree grates, 26 decorative street lights, sodding, and pavement striping.  Since this project was federally funded, all construction documents are required to meet standards for project delivery as outlined in MoDOT’s Local Public Agency (LPA) manual.