Superior Oil Company, Inc.
Superior Oil of Arnold, Missouri selected Cochran to provide architectural and civil design, geotechnical, survey, construction inspection and testing services for their new 20,000 square foot pre-engineered metal building warehouse facility and 3,000 square foot office. The warehouse included hazardous and non-hazardous sections along with a dispensing room, loading dock, and large storage tank farm.
With in-house collaboration between Cochran’s civil and geotechnical teams, soil issues and foundation challenges were addressed prior and during construction to ensure the project schedule was not interrupted.