Glaize Creek Public Sewer District

Cochran performed engineering design and construction oversight of an EPA grant project to double the size of the treatment system to process a capacity of 1.9 MGD.

Engineering Services included:

  • Construction of new 1.0 MGD contact stabilization plant
  • Rehabilitated the existing 0.9 MGD contact stabilization plant
  • New flow measurement/flow splitting system
  • Aeration blowers with piping
  • Associated Electrical Distribution system.
  • Design of a new UV disinfection system to be in conformance with MDNR regulations.

Follow the link to learn more about Cochran’s Water & Waste Water Services that we provide.