Cochran performed the surveying, geotechnical investigation and analysis, design, bidding documents, construction administration, inspection, and materials testing for this federal aid bridge replacement along Westlink Industrial Drive in the City of Washington. The project included clearing and grubbing; unclassified excavation; 2,889 cy of embankment in place; 2,201 sy of 11” thick non-reinforced concrete pavement; 8” diameter sanitary sewer main relocation; 10” water main relocation; guardrail; type 2 rock blanket; construction signage; 1,275’ of structural steel piles; pile point reinforcement; 798 sy of slab on concrete I-Girder; 69 ft prestressed concrete I-Girders; seeding; and pavement striping. This project was federally funded and all construction documents were required to meet standards for project delivery as outlined in MoDOT’s Local Public Agency (LPA) manual.