Cochran performed an analysis of sewage collection and treatment facilities for the City of Union, which included an inflow & infiltration study. Based on the study outcome, Cochran designed a new lift station for the City of Union, Missouri to serve the Highway 47 South area of town.
The lift station will be constructed in two phases and will be a triplex station. The initial phase will consist of two pumps and will provide service to the existing area. A third pump will be installed upon the future build out to serve approximately 1,550 future lots.
At full build-out, the station will be designed to pump 900 GPM at 100 feet of total dynamic head. In addition, a new overflow basin will be constructed to provide temporary storage for this station should power be disrupted.
Follow the links to learn more about our Water Resource Management services or to view additional Water projects.