Projects

Built on Trust

Cochran’s reputation for quality customer service has been built on a strong foundation of performance. We are known for honoring our commitments and as a result, 95% of our clients come back for new projects.

Ridge Road Bridge

For years, the Ridge Road Bridge served as an important connection for Sullivan, Missouri, carrying local traffic across the existing crossing as an aging bridge. As the bridge aged, Franklin County identified the need to replace the structure and pursued federal-aid funding to provide a new, long-term solution. The project was developed as a federally funded bridge replacement. 

Franklin County partnered with Cochran to take the project from surveying and design through bidding. Cochran provided surveying, structural engineering and preparation of the bidding documents for the replacement bridge. The new structure is a single span bridge utilizing NU35 prestressed concrete girders, selected to provide an efficient and cost-effective solution for Franklin County.

Project Details

Market

Transportation

Location

Sullivan, Missouri

Size

90’ by 32’ bridge
188 LF of 32-inch open concrete barrier curb

Services

Surveying
Structural Design
Bidding Documents

The project included the removal of the existing bridge, clearing and grubbing, excavation and embankment, new asphalt pavement, Type 2 rock blanket for slope protection, concrete bridge construction, open concrete barrier curb, reinforcing steel, construction signage and site restoration. Cochran coordinated the structural and roadway improvements and prepared the construction documents in accordance with MoDOT’s Local Public Agency (LPA) requirements for federally funded projects. 

With construction completed in Fall 2021, the completed Ridge Road Bridge provides Franklin County with a new, durable crossing and improved roadway connection, while making efficient use of available federal transportation funding.

Connect with Cochran

Connect with us to bring the right expertise to your next project.