Projects
Built on Trust
Cochran’s reputation for quality customer service has been built on a strong foundation of performance. We are known for honoring our commitments and as a result, 95% of our clients come back for new projects.

Superior Oil
Superior Oil partnered with Cochran to develop a modern industrial facility designed to support the company’s expanding operations and specialized storage requirements. Located in Arnold, Missouri, the project included the design and construction of a 20,000-square-foot pre-engineered warehouse facility and a 3,000-square-foot office building, creating a centralized hub for distribution, storage, and administrative functions.
Project Details
Market
Commercial / Retail
Location
Arnold, Missouri
Size
23,000 SF
Services
Architecture
Engineering Design
Geotechnical Engineering
Land Surveying
Construction Testing & Inspection
Cochran provided a full range of professional services, including architectural design, civil engineering, surveying, geotechnical engineering, construction inspection, and materials testing. The facility was carefully planned to accommodate both hazardous and non-hazardous material storage, featuring dedicated dispensing areas, loading dock operations, and a large storage tank farm designed to support the company’s operational needs while maintaining safety and regulatory compliance.
A key factor in the project’s success was the seamless collaboration between Cochran’s civil and geotechnical engineering teams. Through early identification and proactive management of site and foundation challenges, our team developed effective solutions that minimized construction risks and helped keep the project on schedule.
The completed facility provides Superior Oil with a durable, efficient, and scalable operations center that supports continued growth while demonstrating Cochran’s ability to deliver integrated engineering and design solutions for complex industrial developments.








