Projects
Built on Trust
Cochran’s reputation for quality customer service has been built on a strong foundation of performance. We are known for honoring our commitments and as a result, 95% of our clients come back for new projects.

Westlink Industrial Drive Bridge Replacement BRM-6400(619)
Cochran partnered with the City of Washington to replace the Westlink Industrial Drive Bridge, a vital transportation link serving the Westlink Industrial Park and the manufacturers that rely on it for daily operations. The project was driven by the need to accommodate exceptionally heavy transformer loads transported weekly to a nearby rail facility, ensuring local industries could continue operating efficiently and supporting the region’s economic vitality.
Project Details
Market
Transportation
Location
Washington, Missouri
Size
190 Feet PSIG on Web Wall Piers and Pile Caps on Pile
Services
Engineering Design
Land Surveying
Geotechnical Engineering
Bid Administration
Construction Administration
Construction Testing & Inspection
Recognizing the unique demands of the corridor, Cochran designed a replacement bridge with a load-carrying capacity exceeding standard HS20 requirements. Through advanced structural analysis and specialized bridge design, the new structure was engineered to safely support oversized industrial transport vehicles while providing long-term durability and reliability.
As the lead engineering consultant, Cochran delivered comprehensive services including surveying, geotechnical engineering, bridge and roadway design, utility coordination, bidding assistance, construction administration, inspection, and materials testing. The project also included roadway reconstruction, utility relocations, deep foundation systems, prestressed concrete bridge construction, guardrails, erosion protection, and pavement improvements, creating a fully modernized transportation corridor.










