Projects
Built on Trust
Cochran’s reputation for quality customer service has been built on a strong foundation of performance. We are known for honoring our commitments and as a result, 95% of our clients come back for new projects.

MBR Treatment Plant
Cochran partnered with St. Charles County PWSD 2 to deliver a forward-looking wastewater treatment system designed to support residential growth while protecting the region’s water resources. The project included the planning and design of a state-of-the-art 0.25 million-gallon-per-day (MGD) membrane bioreactor (MBR) wastewater treatment facility with the ability to expand to 1.0 MGD as future development occurs.
Project Details
Market
Water Resource Management
Location
St. Charles County, Missouri
Size
0.25-1.0 MGD Wastewater Treatment Facility
4.75 Miles of 8- to 12-Inch Sewer Main
Services
Engineering Design
Land Surveying
The project also included the design of approximately 4.75 miles of sanitary sewer infrastructure to serve a 380-lot residential development, along with a regional lift station sized to accommodate 112 residential lots and a future elementary school. To ensure environmental stewardship and regulatory compliance, Cochran completed a comprehensive receiving stream impact study and incorporated provisions for future ultraviolet (UV) disinfection capable of treating peak flows of up to 4.0 MGD.
Providing a truly multidisciplinary solution, Cochran delivered civil, mechanical, electrical, and structural engineering services for the facility. The advanced treatment plant utilizes flat-panel membrane technology to consistently produce high-quality effluent that meets stringent regulatory standards while providing operational flexibility and long-term reliability. The design also includes a dedicated laboratory to support process monitoring, regulatory compliance, and ongoing treatment optimization.









